Login   /  
中国页 Página brasileira Página española                                Facebook page  YouTube channel  Flickr images
Search
 

 Arrow Patients and Carers
    DiamondSpinal Injuries  
  Dotted line  
    DiamondStrokes  
  Dotted line  
    DiamondMultiple Sclerosis  
  Dotted line  
 Arrow Medical Professionals
    DiamondSpinal Injuries  
  Dotted line  
    DiamondStrokes  
  Dotted line  
    DiamondMultiple Sclerosis  
  Dotted line  

 

“The Bladder Control System gave my life back to me”Amanda Boxtel
 
“My bladder does not dominate my life anymore”.
Jo Wright
 
“I can’t remember when I last had a UTI” Lesley
 
"The number of infections that I have had since implanting this device can be counted on the fingers of one hand" Martin

 

EU Framework 6- Healthy Aims - Key Facts

Healthy Aims Logo

Overall objectives:
  • Develop a range of medical implants and diagnostic equipment to help the ageing population and those with disabilities.  It has been estimated that around 50% of the western population, some 500 million people, are affected by at least one of the health problems targeted in this project.
Our objectives:
  • Design, develop, test, trial and approve a novel implantable upper limb muscle stimulator
  • Manage the Functional Electrical Stimulation (FES) work package
Our achievements:
  • Succesfully trialled the STIMuGRIP ® system - restores control of the wrist and hand grasp action to the user following spinal cord injury, a stroke, the onset of MS or other neurological injury.
  • Developed:
    • implantable epimysial electrode
    • implantable inductively coupled receiver (stimulator)
    • epimysial surgical probe
    • surgical stimulator
    • wireless charger
  • Managed the Functional Electrical Stimulation (FES) work package - presentations, progress reports, financial reports.
  • Managed ethical approval applications and clinical trial applications for entire project.
Project information:
  • European Union Framework Package VI project.
  • 26 partners, including 6 SME's, across 9 EU countries.
  • Funded under the IST Microsystem programme.
  • €26 million project fund.

More information can be found at Healthy Aims - Further Information.

 Print  
 Latest from Blog
Finetech Medical exhibits at the INS 12th World Congress, Montreal Canada by Jack Spensley
International Knowledge Exchange of SDAF-SARS Conference by Newsroom

Finetech Medical attends an International Knowledge Exchange conference on SDAF-SARS in China

Sir Phillip Craven MBE talks to Finetech Medical about his life and his experiences with the Bladder Control System by Newsroom

Sir Philip Craven- current President of the International Paralympic Committee (IPC)Sir Philip Craven talks about his Bladder Control System “Without the Finetech-Brindley system I would have had to work from home and Presidents should not do that.”

EU Framework 6- Healthy Aims-STIMuGRIP development | EU Framework 6 - Healthy Aims - Key facts | EU Framework 6- Healthy Aims - Further Information
Copyright © 2008 Finetech Medical. All rights reserved. Website maintained by  Finetech Medical